TESTING
Gas Insulated Substation is designed to operate with minimum maintenance. However, either routine or situational check is still compulsory to check your asset current condition and the right decision to take.
Accessible part for condition testing are SF6 Gas Quality, leakage possibility, online partial discharge, circuit breaker, and contact resistance test.